Resources

Tools, guides and plain-English answers.

Everything free to use before you commission anything: the calculators, the downloadable checklists, a glossary of the terms that come up most, and the full insights library.

Free tools

No obligation, no login beyond an email address to see the result.

Calculator

Carbon footprint calculator

A quick Scope 1-3 estimate across energy, travel and common spend categories.

Try it →
CBAM

UK CBAM exposure check

See where you stand against the £50,000 rolling threshold and your supplier data readiness.

Check exposure →
Estimator

Embodied carbon estimator

An early, indicative structural embodied carbon range from a few basic building parameters.

Estimate now →

Downloadable guides

PDFs you can send straight to a supplier, a colleague, or keep for reference.

Checklist

UK CBAM supplier data checklist

What to ask every supplier for, broken down by sector: aluminium, cement, fertiliser, hydrogen, iron & steel.

Download PDF →
Explainer

UK CBAM default values, explained

The PDF version of our most detailed UK CBAM article, for sharing internally or with suppliers.

Download PDF →
Reference

Our methodology

The standards, data hierarchy and review process behind every report we deliver.

Read it →

Glossary

The terms that come up most across Carbon Reduction Plans, embodied carbon and UK CBAM.

Embedded emissions
The greenhouse gas emissions released in producing a good, used under UK CBAM to calculate the charge on imports.
Default value
A conservative national or sector-average emissions figure used under CBAM when a supplier hasn't provided verified data.
Scope 1, 2 & 3
The GHG Protocol's classification: Scope 1 is direct emissions, Scope 2 is purchased energy, Scope 3 is everything else in the value chain.
Embodied carbon
Emissions from manufacturing, transporting and constructing a building's materials, as distinct from the energy it uses once occupied.
Whole life carbon
Embodied carbon plus operational carbon across a building's full life cycle, including end-of-life, per RICS methodology.
PPN 06/21
The UK government procurement notice requiring a Carbon Reduction Plan on qualifying public sector contracts.
PAS 2080
The British Standards Institution's specification for managing carbon in buildings and infrastructure.
EPD
Environmental Product Declaration, a verified, standardised report of a specific product's environmental impact.
Commodity / CN code
The customs classification code that determines whether an imported product falls under a CBAM sector.
Emission shuffling
Routing lower-carbon production toward a regulated market while higher-carbon production continues elsewhere, a risk of relying on default values.
Baseline
The starting-point emissions figure a Carbon Reduction Plan's targets are measured against.
Verification
Independent confirmation that reported emissions data is accurate, distinct from simply reporting a figure.

Further reading

Longer pieces on the regulation and the reasoning behind it.

Insight

UK CBAM's default value

Why a default value isn't a safe fallback for either side, for suppliers and UK importers.

Read →
Insight

What a Carbon Reduction Plan needs

What PPN 06/21's mandated format actually requires, section by section.

Read →
Index

All insights

The full library, including material comparisons, supply chain data and assessment methodology.

Browse all →

Rather talk it through?

A discovery call costs nothing and tells you exactly what's needed.

Book a call