Project basics
RIBA stage
Design dev.
Construction
As-built
Stage affects how confident to treat this figure, not the calculation itself.
Building basics
Material quantities
Factors are typical A1–A3 defaults, editable. For a bid or formal report, replace these with product EPDs or a One Click LCA run.
Where this lands
Benchmarks are shown as total tCO2e for your floor area, so you can see the scale of the carbon budget before design has started. Sources: RIBA 2030 Climate Challenge v2, LETI Embodied Carbon Primer, cross-checked directly against both publications.
Want a figure you can actually build to?
This is an indicative planning tool, not a compliant Life Cycle Assessment. A formal embodied carbon assessment is modelled against your real drawings and bill of quantities in One Click LCA.
Book a discovery call